Title | Description | Date Published | File Type | Size | |
---|---|---|---|---|---|
TC 2024 Annual Report | Technical Committee 2024 Annual Report | 28 Mar 2025 | ![]() |
404 KB | |
Study on the Viability and Technical Impact of RE Resources as Embedded Generator | Study on the Viability and Technical Impact of RE Resources as Embedded Generator | 28 Feb 2025 | ![]() |
456 KB | |
Review on the Possible Consolidation of Electric Cooperatives | Review on the Possible Consolidation of Electric Cooperatives | 28 Feb 2025 | ![]() |
1 MB | |
Study on the Inclusion of Biomass Plants as Must-Dispatch | Study on the Inclusion of Biomass Plants as Must-Dispatch | 28 Feb 2025 | ![]() |
319 KB | |
Review of the Adequacy of Rules and Procedures for BESS Participation in the WESM | Review of the Adequacy of Rules and Procedures for BESS Participation in the WESM | 28 Feb 2025 | ![]() |
2 MB | |
Day-ahead Market in the WESM | Day-ahead Market in the WESM | 28 Feb 2025 | ![]() |
273 KB | |
Proposed Revision to the WESM Manual on Market Network Model Development and Maintenance - Criteria and Procedures | Proposed Revision to the WESM Manual on Market Network Model Development and Maintenance - Criteria and Procedures | 28 Feb 2025 | ![]() |
593 KB | |
Review on the Viability of EG as Emergency Power Supply in Highly Urbanized Area | Review on the Viability of EG as Emergency Power Supply in Highly Urbanized Area | 28 Feb 2025 | ![]() |
237 KB | |
Distribution System Operator (DSO) Managed Network | Distribution System Operator (DSO) Managed Network | 28 Feb 2025 | ![]() |
347 KB | |
Demand Side Bidding in the WESM (Part 2) | Demand Side Bidding in the WESM (Part 2) | 28 Feb 2025 | ![]() |
1 MB | |
TC 2023 Annual Report | Technical Committee 2023 Annual Report | 27 Mar 2024 | ![]() |
464 KB | |
TC 2022 Annual Report | Technical Committee 2022 Annual Report | 31 Mar 2023 | ![]() |
525 KB | |
TC 2021 Annual Report | Technical Committee 2021 Annual Report | 30 Mar 2022 | ![]() |
327 KB | |
Demand-Side Bidding in the WESM | TC Paper on Demand-Side Bidding in the WESM | 16 Jul 2021 | ![]() |
486 KB | |
TC Consultation on Demand-Side Bidding | Consultation Paper on Demand-Side Bidding | 23 Mar 2021 | ![]() |
381 KB | |
TC 2020 Annual Report | Technical Committee 2020 Annual Report | 12 Mar 2021 | ![]() |
380 KB | |
Study on Impounding HEPPs | DOE Study Request on the Reclassification of Impounding HEPPs as Non-Scheduled Generating Unit | 16 Jul 2020 | ![]() |
446 KB | |
TC 2019 Annual Report | Technical Committee 2018 Annual Report | 25 Mar 2020 | ![]() |
287 KB | |
TC 2018 Annual Report | Technical Committee 2018 Annual Report | 27 Mar 2019 | ![]() |
676 KB | |
Study on Increasing Penetration of VRE Resources and the Reserve Market | Technical Committee Study on Increasing Penetration of VRE Resources and the Reserve Market | 21 Sep 2018 | ![]() |
3 MB | |
TC 2017 Annual Report | Technical Committee 2017 Annual Report | 28 Mar 2018 | ![]() |
3 MB | |
TC 2016 Annual Report | Technical Committee 2016 Annual Report | 24 Mar 2017 | ![]() |
281 KB | |
Study on Framework of BESS Participation in the WESM | Study on the Framework of Participation of Battery Energy Storage (BES) Systems in the WESM | 24 Jan 2017 | ![]() |
6 MB | |
Study on Pmin of CCGT | Study on the Minimum Stable Load of Combined Cycle Gas Turbine Plants | 29 Apr 2016 | ![]() |
302 KB | |
TC 2015 Annual Report | Technical Committee 2015 Annual Report | 29 Mar 2016 | ![]() |
4 MB | |
Study on Dispatch Tolerance Limit | Technical Committee Study on Dispatch Tolerance Limit | 18 Sep 2015 | ![]() |
660 KB | |
TC 2014 Annual Report | Technical Committee 2014 Annual Report | 27 Mar 2015 | ![]() |
7 MB | |
TC 2013 Annual Report | Technical Committee 2013 Annual Report | 28 Mar 2014 | ![]() |
7 MB | |
Study on Luzon HEPPs | Technical Committee Study on Luzon Hydroelectric Power Plants | 13 Dec 2013 | ![]() |
5 MB | |
TC 2012 Annual Report | Technical Committee 2012 Annual Report | 29 Mar 2013 | ![]() |
204 KB |
Welcome to the Philippine Electricity Market Corporation website. By proceeding, you expressly agree that your personal information will be processed in accordance with the Data Privacy Act of 2012 and PEMC’s Privacy Policy.